Filter Search for grants
Call Navigation
Call key data
Demonstration of sustainable tidal energy farms
Funding Program | Horizon Europe - Cluster 5 - Destination 3: Sustainable, secure and competitive energy supply | |
Call number | HORIZON-CL5-2023-D3-01-08 | |
deadlines | Opening 13.12.2022 | Deadline 30.03.2023 17:00 |
Funding rate | 70% (NPO:100%) | |
Call budget | € 40,000,000.00 | |
Estimated EU contribution per project | € 20,000,000.00 | |
Link to the call | ec.europa.eu | |
Link to the submission | ec.europa.eu |
Call content
short description | Demonstration of sustainable tidal energy pilot farms (minimum 4 MW installed capacity and at least 4 devices) in full operational conditions for long periods of time is essential to advance this sector. It is the way to bridge the gap from technology development to market development while reducing costs, reducing risks and attracting investors for future commercial projects. The farm is expected to be composed of several devices of the same series. |
Call objectives | The tidal energy farms have to be connected to the electricity grid. To focus on the technologies with the greatest chances of success, the single tidal device to be used in the array deployment is expected to be satisfactorily demonstrated at full scale before, with limited changes to incorporate the learnings. Any change on the tidal device may be incremental but should not involve fundamental changes to the device design or composition.’ The innovation component should mainly lie on the pilot farm systems and supporting industrial manufacturing activities that enable a cost-effective and high-performance pilot farm. The project is expected to deploy a tidal energy farm with a minimum capacity of 4 MW and operate the farm at least 2 years in the lifetime of the project. After the project it is expected that the farm will continue to be operated for at least 8 years. The project should develop and execute an effective operation and maintenance programme. Proposals are expected to address also all the following for both the supporting infrastructure for the farm and for the individual devices themselves:
The project has to include a clear go/no go moment ahead of entering the deployment phase. Before this go/no-go moment, the project has to deliver the detailed engineering plans, a techno-economic assessment, including key performance indicators based on international recognized metrics, a complete implementation plan and all needed permits for the deployment of the project, and if needed a plan to achieve certification by an independent certification body before the end of the action. The project proposal is expected to present a clear and convincing pathway to obtain necessary permits for the demonstration actions and allow for appropriate timelines to achieve these. The project is expected also to demonstrate how it will get a financial close for the whole action. For this the use of other EU/national/regional support mechanisms can be considered. Independent experts will assess all deliverables and will advise for the go/no-go decision. The exploitation plans should include preliminary plans for scalability, commercialisation, and deployment (feasibility study, business plan, financial model) indicating the possible funding sources to be potentially used (in particular the Innovation Fund). Data from the pilot structures should be collected to understand the performance and behaviour of the structure and the surrounding environmental condition, to optimise the concept and understand the environmental impact of tidal energy harvesting. The selected projects are expected to contribute to the BRIDGE initiative, actively participate to its activities and allocate up to 2% of their budgets to that end. Additional contributions to the ‘Alliance for Internet of Things Innovation’ (AIOTI) and other relevant activities (e.g. clusters of digital projects and coordinating actions) might be considered, when relevant. read more |
Expected results |
|
Regions / countries for funding | EU Member States, Overseas Countries and Territories (OCT) Moldova (Moldova), Albania (Shqipëria), Armenia (Հայաստան), Bosnia and Herzegovina (Bosna i Hercegovina / Босна и Херцеговина), Faeroes (Føroyar / Færøerne), Georgia (საქართველო), Island (Ísland), Israel (ישראל / إِسْرَائِيل), Kosovo (Kosova/Kosovë / Косово), Montenegro (Црна Гора), Morocco (المغرب), North Macedonia (Северна Македонија), Norway (Norge), Serbia (Srbija/Сpбија), Tunisia (تونس /Tūnis), Türkiye, Ukraine (Україна), United Kingdom |
eligible entities | EU Body, Education and training institution, International organization, Natural Person, Non-Profit Organisation (NPO) / Non-Governmental Organisation (NGO), Other, Private institution, incl. private company (private for profit), Public Body (national, regional and local; incl. EGTCs), Research Institution incl. University, Small and medium-sized enterprise (SME) |
Mandatory partnership | Yes |
Project Partnership | To be eligible for funding, applicants must be established in one of the following countries:
Only legal entities forming a consortium are eligible to participate in actions provided that the consortium includes, as beneficiaries, three legal entities independent from each other and each established in a different country as follows:
Any legal entity, regardless of its place of establishment, including legal entities from non-associated third countries or international organisations (including international European research organisations) is eligible to participate (whether it is eligible for funding or not), provided that the conditions laid down in the Horizon Europe Regulation have been met, along with any other conditions laid down in the specific call topic. A ‘legal entity’ means any natural or legal person created and recognised as such under national law, EU law or international law, which has legal personality and which may, acting in its own name, exercise rights and be subject to obligations, or an entity without legal personality. Specific cases:
|
other eligibility criteria | Activities are expected to achieve TRL 8 by the end of the project. For the Technology Readiness Level (TRL), the following definitions apply:
If projects use satellite-based earth observation, positioning, navigation and/or related timing data and services, beneficiaries must make use of Copernicus and/or Galileo/EGNOS (other data and services may additionally be used). |
Additional information
Topics |
Air Quality, Biodiversity & Environment, Climate & Climate Change, Water quality & management, Circular Economy, Natural Resources, Energy Efficiency, Renewable Energy |
Relevance for EU Macro-Region | EUSAIR - EU Strategy for the Adriatic and Ionian Region, EUSALP - EU Strategy for the Alpine Space, EUSBSR - EU Strategy for the Baltic Sea Region, EUSDR - EU Strategy for the Danube Region |
UN Sustainable Development Goals (UN-SDGs) |
![]() ![]() ![]() |
Additional Information | All proposals must be submitted electronically via the Funders & Tenders Portal electronic submission system (accessible via the topic page in the Search Funding & Tenders section). Paper submissions are NOT possible. Proposals must be complete and contain all parts and mandatory annexes and supporting documents, e.g. plan for the exploitation and dissemination of the results including communication activities, etc. The application form will have two parts:
Annexes and supporting documents will be directly available in the submission system and must be uploaded as PDF files (or other formats allowed by the system). The limit for a full application (Part B) is 45 pages. |
Call documents | HE-Work Programme 2023-2024, Cluster 5, Destination 3 (1046kB) |
Contact | National Contact Points for Horizon Europe Website |
To see more information about this call, you can register for free here
or log in with an existing account.
Log in
Register now